West Epsilon / Gudrun hook-up

NAVIC Engineering was responsible for all phases of the project, from concept to executive design of the PORT and STBD gangways between West Epsilon and Gudrun Top Side.

NAVIC’s scope of work:
• PORT side gangway
• STBD side gangway
• Spreader beams for lifting stair tower and all lifting arrangements
• Connection interface with the hull structure

Delivered: 2013