Adapting the Deepsea Atlantic platform to the new drilling campaign
The NAVIC team was responsible for the project in all phases – from concept to executive design with DNV-GL certification.
Within the scope of work NAVIC performed:
1) Design of the deck and staircase for newly installed Halliburton refrigerators
2) Modification of the foundation and sea fastening for a new wire line unit
3) Verification of the deck structure including the sea fastening under the new RMR unit.